Project Category : Pipeline Works
Location : SAUDI ARABIA, JUBAIL
Duration : 4 YEARS
Status : ON PROGRESS
Project Summary
The purpose of this projects to develop new facilities that deliver AH crude oil, treated gas and condensate from the planned Zuluf Central Processing Facility (ZCPF) to the designated termination points.
LSTK DenysArabia scope is to detail design, procure and construct new facilities to deliver produced hydrocarbons from the proposed ZCPF to its designated customers by installing following downstream pipelines:
- 42” ZFJ-1 pipeline to deliver AH crude oil to Ju’aymah Terminal (JT). In addition, a new jump-over to existing KRT-3 pipeline for AH crude oil delivery to RasTanura Terminal South(RTTS). In addition, jump over of ZFJ-1 from SK-3 & SK-4.
- 18” ZFBGT-1 pipeline to proposed Scraper Trap Facility at KM-22 of SK corridor to deliver treated gas to Tanajib Gas Plant (TGP) and flexibility supply to Berri Gas Plant (BGP) and Khursaniyah Gas Plant (KGP).
- 10” ZFBCL-1 pipeline to proposed Scraper Trap Facility at KM-22 of SK corridor to deliver produced condensate to TGP and flexibility supply to BGP and KGP.